CLIENT
IGP Powder Coatings
INDUSTRY
Ventilation, air conditioning, heating
FACILITY TYPE
Office building with staff area, production hall, and warehouses
2-story office building with an area of 580 m²
- Ventilation system utilizing 2 Klimor air handling units.
- Toshiba 2-pipe VRF air conditioning system installation.
- Server room air conditioning system utilizing a Toshiba split unit.
2-story office building with an area of 580 m²
- Ventilation system utilizing 2 Klimor air handling units.
- Toshiba 2-pipe VRF air conditioning system installation.
- Server room air conditioning system utilizing a Toshiba split unit.
In Numbers
54,000 m³/h
Air handling units total capacity
310 and 92 kW
Total heating and cooling capacity of air conditioning and heating
30,000 m³/h
Total capacity of exhaust fans for technical rooms
23
Destratification fans