CLIENT
Magna Automotive Poland Sp. z o.o.
INDUSTRY
Ventilation with cooling, steel structure installation
FACILITY TYPE
Production hall
HVAC engineering design for the modernized ventilation system in the Magna Automotive Poland production hall.
- The project scope included a mechanical ventilation system along with a cooling system to reduce the hall temperature down to 18°C.
- Additionally, the capability to heat the hall during winter.
In Numbers
40,000 m³/h
total airflow capacity
358 kW
total cooling capacity
260 kW
total heating capacity
























